Page 34 - Atlas_2019_rus
P. 34

Territory of advanced social and economic development Pikalevo




                                                                          Industrial area       Electrical substation
                                                                          Agricultural area     Sewage treatment
                                                                                                facilities
                                                                          Industrial park area
                                         Station Pikalevo-1               Residential areas and   Railway stations
                                              Depot of Pikalevo           purpose-built areas   Thermal power station
                                              Industrial Railway
       Bolshoy Dvor
                                              Transport Enterprise        Investment sites      Gas distribution station
                                                   Limestone
        Tikhvin                      Leningradskoye highway  ore crusher
                                                                             Slurry storage
                                                                   Pikalyovskiy
                                                   Station Fabrichnaya
                                                                    Cement
                                                                         Pikalevsky
                           Greenhouses  Solid waste                     Alumina Refinery
                           Krugly God  disposal polygon                               Pikalevsky Reinforced
                                                                                      Concrete Products Plant  Pikalevo
                                                                                       Pikalevsky foamed concrete
                                                                            Station Pikalevo-2        Industrial Park
                                                                                                            Paksheevo
                                                     r. Ryadan                                      Roadside
                                                                                                    station
                                                                             Spryamlennoye highway
                                                                                                    Obrinsky
                                                                                       Pikalevskie
        Information about the territory:                        Gas       Thermal power station  Kolbasy     Vologda
                                                                distribution
                                                                station                         Vologodskoye highway
        • Established by the Resolution of the                      Road
                                                                    maintenance
                                        A-114 Vologda – Novaya Ladoga
        Government of the Russian Federation in 2018                and construction
                                                                    department
        • 10 years  – duration period*                                                                  A-114 Vologda – Novaya Ladoga
        • 100,000 people  – labour potential
        (Pikalevo, Boksitogorsk, Tikhvin)
        *prolongation is considered                                                                 Anisimovo
        Requirements to an investment project:                    Specialization:
                                                                  • Production of electrical equipment
                                                                  • Production of chemical substances and chemical
              <25%             from 10         from 2.5 mln RUB   products (except for compressed gas)
           foreign labour        jobs             volume of       • Production of machinery and equipment
               force                             investments      (not included in other groups)
                                                                  • Provision of temporary accommodation
         Taxes and payments   First 5 years     Next 5 years      (except for provision of other temporary
                                                                  accommodation)
         Corporate property tax 0% (instead of 2.2%)  1.1% (instead of 2.2%)
         Corporate income tax 5% (instead of 20%)   13% (instead of 20%)
                                                                  More detailed information is available
            Land value tax           0% (instead of 1.5%)         by the link (QR code):



          34                                                                                Leningrad region: Investor’s guide
   29   30   31   32   33   34   35   36   37   38   39